Monitoring Load and Corrosion
Take a load off with Water, Kentledge or Hydraulics
Every load test undertaken and subsequent monitoring of load and deflection is bespoke and designed to meet the clients requirements.
HTA can install and design the required temporary and enabling works, including installation of crash decks or reaction frames.
Structural Load Testing Investigations include
The following list is not exhaustive, however it gives a good idea of the range of elements tested and the appropriate test method, if there is something you require that is not listed please get in touch, as we will most likely be able to assist.
An example of what we structurally test:
- Reinforced Concrete Suspended Floors
- Prestressed Concrete Suspended Floors
- Parapets and Ballastrades
- Railway Station Platforms
- Roofs
- Freestanding Masonry Walls
- Grouted Ground Anchors
- Chemical Anchors
- Remedial Wall ties
An example of how we carry out tests:
Application of Load
- Using Water to Apply Load
- Using Kentledge to Apply Load
- Using Jacks/Cylinders to Apply Load
Monitoring Load and Deflection
- Using Digital Linear Velocity Displacement Transducers (LVDT)
- Using Load Cells
Monitoring is always carried out remotely using multi channel data logger to ensure safety of all staff and accuracy of results.
Testing the structural elements of Bridges and Buildings
We have successfully carried out Corrosion Monitoring to a number of bridges and marine structures.
With the installation of corrosion probes which then can be monitored at intervals to determine any changes in corrosive activity with time.
Monitoring Techniques
Henderson Thomas Associates "HTA" can carry out load testing to bridges and buildings and their structural elements using various techniques such as:
- Installation of vibrating wire gauges
- Linear velocity displacement transducers
- Simple measuring techniques such as digital gauges
Applying Load to a Chimney Stack
The movement seen was made by hand pushing the other side.
Due to how easy this chimney was deflected there was a request by the client to carry out a full proof load test.
Watch more videos of the HTA crew at work by clicking here
Under pressure with Structural Load Testing projects?
Take advantage of our Open Door Policy
Even if you do not end up using HTA we are happy to advise on the best course of action for the outcome you wish to achieve.
It is impossible for one company to carry out every project, however we can share our expertise far and wide.
Call: 0800 657 212 or Email: testing@hendersonthomas.co.uk