Bridge Testing Expertise
Employing the latest NDT including Robotics
HTA are the leading experts in Bridge Testing, from introducing Robotics to the UK, alongside 25+ years of experience, your project will always be in safe hands.
A Multi Disciplined & Multi Skilled Approach is paramount when working on bridges, HTA offer a full remit of services therefore removing the hassle of project managing multiple companies on site.
Bridges are complex in nature and makeup
access & completion always requires careful planning
therefore it is vital to employ competent engineers
Bridge Testing for Various Bridge Types
The following lists are not exhaustive, however they give a good idea of the scope of work HTA can fulfil.
Concrete Bridge Testing
- Covermeter surveys
- Half-cell potential surveys
- Resistivity surveys
- Linear Polarisation Surveys
- Crack Surveys
- Visual + PI Surveys
- PUNDIT Surveys
- Carbonation depth surveys
- Extraction of dust and core samples for subsequent laboratory testing
Steel Bridge Testing
- Ultrasonic Thickness Surveys (determine corrosion)
- Weld Testing
- Extraction of samples for determination of material type / strength / chemical composition (for welding specifications)
Masonry Bridge Testing
- Strength Testing - Removal of samples of masonry / mortar for lab tests
- Make up testing - determination of construction details via NDT & intrusive methods
Cable Stay Bridge Testing
- Visual Survey - using 4No. HD Cameras
- Magnetic Flux Leakage Testing - to determine loss of metallic area - see image below
The results are represented as graphs highlighting the LMA per area. These can be used to interpret individual strand and the defect that has occurred. The percentage of LMA can then be used to determine the severity of the issue and the remediation methods required
Maximise the above Bridge Testing with the following:
HTA can provide a Full Remit of services, removing the hassle of managing multiple companies on site and are able to undertake and supply the following:
- Traffic Management - supply of Chapter 8 lane closures
- Access including
- Working near water, supply of the following:
- Reinstatement including
- - MEWPS
- - Mobile Scaffold
- - Underbridge Units
- - Roped Access
- - Drones
- - Pontoons
- - Safety Boats
- - 'RYA' & 'DEFRA" Certificated & Trained Staff
- - Roped Access
- - Drones
- - Concrete
- - Masonry & Brickwork
- - Waterproofing
- - Trial Pits
- - Carriageway surfacing
Watch Robotics at work on a Cable Stay Bridge
In conjunction with IPC we brought this technology from the USA to the UK
Watch more videos of the HTA crew at work by clicking here
Bridge the Testing Gap with HTA
Take advantage of our Open Door Policy
Even if you do not end up using HTA we are happy to advise on the best course of action for the outcome you wish to achieve.
It is impossible for one company to carry out every project, however we can share our expertise far and wide.
Call: 0800 657 212 or Email: testing@hendersonthomas.co.uk

Buildings
Buildings
Buildings
Buildings